pipe spool fabrication production line long-distance pipelines service-oriented

Just Fill In The Form Below, Click Submit, You Will Get The Price List, And We Will Contact You Within One Working Day. Please Also Feel Free To Contact Us Via Email Or Phone. (* Is Required).

  • Field fabrication and installation of Piping systems

    2021-9-29u2002·u2002Field Fabrication of Piping spools. The installation of pipe systems follows its fabrication and is very frequently a part of it. The installation of pipe can be accomplished in the following two primary ways, or combinations thereof:

    Get Price
  • Pipe Spool Fabrication Sequencing by Automated Planning

    Pipe spools are usually pre-fabricated from a number of raw pipes and pipe fittings (e.g. elbows, flanges, tees, etc.) in fabrication shops. Pipe spool fabrication is often affected by various ...

    Get Price
  • Anticorrosion Technology of Buried Petroleum Pipeline

    2020-9-9u2002·u2002For long-distance pipelines and gathering pipeline networks that transport oil and natural gas, the adoption of external anti-corrosion technology and construction quality of pipelines are directly related to the operation and service life of pipelines. Therefore, the anti-corrosion protection of buried oil and natural gas pipelines is increased.

    Get Price
  • Piping Fabrication and Erection Specification

    PIPE SUPPORTS - Piping Fabrication and Erection Specification All field supports shall be installed in accordance with the standard drawings. If the field supports are not installed or are unavailable when the piping is erected, u s e temporary blocking or other adequate means of support until the field supports can be installed.

    Get Price
  • Offshore Pipelines

    2016-8-13u2002·u2002use of spool concrete protection covers, which also act as anchors. The Mica Field is located in Mississippi Canyon Block 211 in the Gulf of Mexico, approximately 100 miles south of Mobile Bay, Alabama in water depth of 4,350 ft. Two 28 mile long production flowlines (an 8-inch x 12-inch pipe-in-pipe insulated flowline and an

    Get Price
  • Difference Between ERW and UOE Steel Pipes

    2019-12-19u2002·u2002The purchase cost of ERW steel pipes is low, and the cost of UOE steel pipes is very high, and the general price difference is 15% -25%. There are fewer domestic manufacturers of UOE steel pipes, which makes procurement difficult. When the diameter is less than 406mm, the difference in purchasing costs is even greater.

    Get Price
  • Oil and Gas Pipeline Design, Maintenance and Repair

    2006-8-25u2002·u2002PE 607: Oil & Gas Pipeline Design, Maintenance & Repair ٢ Contents • Repair strategy • Replacement • Grinding out defects • Weld overlay • Full encirclement sleeve • Fillet welded patch • Flush welded patch • Welded leak box • Mechanical clamp • Composite overwrap • Buried pipe rehabilitation • Brushed and sprayed lining and

    Get Price
  • Process Piping Fundamentals, Codes and Standards

    2017-1-22u2002·u2002Pipe sizes are documented by a number of standards, including API 5L, ANSI/ASME B36.10M in the US, and BS 1600 and BS 1387 in the United Kingdom. Typically, the pipe wall thickness is the controlled variable, and the Inside Diameter (I.D.) is allowed to vary. The pipe wall thickness has a variance of approximately 12.5 percent.

    Get Price
  • Metallic Piping Fabrication and Installation Method ...

    This method statement covers the sequence of activities for fabrication, erection and installation procedure for Metallic Piping. The method is useful for carbon steels, alloy steels, stainless steels and nickel alloys systems. Procedure will help to ensure the compliance of piping works with the contractual applications and HSE requirements.

    Get Price
  • Minimum pipe spool length - Pipelines, Piping and Fluid ...

    2006-3-1u2002·u200227 Feb 06 04:03. Can some one out there advice on minimum pipe spool lenth between fittings, I have been using 50mm for 2' pipes and 75mm for 6'. The service is oil production I could not lay my hand on any material to back my practice. Thanks.

    Get Price
  • APTec – Allied Pipeline Technologies, Inc.

    APTec provides complete supply and installation of plastic pipe systems. In conjunctions with our HDPE pipe liner work we maintain a large fleet of thermal fusion-welding machines for HDPE, ranging from 2' (50mm) through 48' (1200mm). Our experience fusion-welding long distance pipelines means we can consistently and safely produce quality ...

    Get Price
  • Pipe Spool Fabrication Sequencing by Automated Planning

    Pipe spools are usually pre-fabricated from a number of raw pipes and pipe fittings (e.g. elbows, flanges, tees, etc.) in fabrication shops. Pipe spool fabrication is often affected by various ...

    Get Price
  • Piping Fabrication Procedure. [d47e32p03jn2]

    Activities shall be done according to the proper method statement for lifting and handling. 8.1.2 Pre-fabricated spools shall be shifted to site carefully; care shall be taken while handling and stacking of spools to prevent any possible damage. 8.1.3 The Pre-fabricated spools shall be identified by spool and line numbers before erection. 8.1.4 ...

    Get Price
  • Offshore Pipelines

    2016-8-13u2002·u2002use of spool concrete protection covers, which also act as anchors. The Mica Field is located in Mississippi Canyon Block 211 in the Gulf of Mexico, approximately 100 miles south of Mobile Bay, Alabama in water depth of 4,350 ft. Two 28 mile long production flowlines (an 8-inch x 12-inch pipe-in-pipe insulated flowline and an

    Get Price
  • Pipeline Introduction

    Transportation of liquids by pipelines has been used for thousands of years. The first major exploitation and commercialization using pipelines started 150 years ago, and the building of long distance, large diameter pipelines was pioneered in the 1940's (Hopkins, 2007).Today's pipeline industry has originated from the oil business that brought considerable amount of profit to the …

    Get Price
  • Challenges and Lessons Learnt From the Design, Fabrication ...

    2019-6-9u2002·u2002To stop pipe walking, measures have been taken, consisting in connection points installed in line during the laying of the pipelines (J-laying) …

    Get Price
  • STRESS ANALYSIS OF UNDERWATER PIPELINE FOR

    2012-4-27u2002·u2002The focal point of this project is the simulation of pipe model using CAESAR II that focuses on the pipe stress analysis subjected to the pipeline. For economic reasons, the material that will be used for the fabrication of pipelines (for production and transmission of oil and gas) is carbon steels (API 5L X65). The area of seabed

    Get Price
  • Fundamentals of Process Plant Layout and Piping Design ...

    The nominal pipe size is 6'; PG is the service abbreviation and denotes 'Process Gas'. 117 is the line sequence number. GE – 2 is the piping material specification. Information on all the valves and valve specifications can also be seen on the P&ID.

    Get Price
  • Minimum pipe spool length - Pipelines, Piping and Fluid ...

    2006-3-1u2002·u200227 Feb 06 04:03. Can some one out there advice on minimum pipe spool lenth between fittings, I have been using 50mm for 2' pipes and 75mm for 6'. The service is oil production I could not lay my hand on any material to back my practice. Thanks.

    Get Price
  • Federal Register :: Oil and Gas and Sulphur Operations in ...

    2007-10-3u2002·u2002The proposed rule clarifies that accessories to ROW pipelines are subject to the requirements currently contained in 30 CFR 250, subpart H, Oil and Gas Production Safety Systems, and 30 CFR 250, subpart I, Platforms and Structures, just like all other OCS structures. It also clarifies that applications for new accessories are subject to Coastal ...

    Get Price
  • APTec – Allied Pipeline Technologies, Inc.

    APTec provides complete supply and installation of plastic pipe systems. In conjunctions with our HDPE pipe liner work we maintain a large fleet of thermal fusion-welding machines for HDPE, ranging from 2' (50mm) through 48' (1200mm). Our experience fusion-welding long distance pipelines means we can consistently and safely produce quality ...

    Get Price
  • Pipe Spool Fabrication Sequencing by Automated Planning

    Pipe spools are usually pre-fabricated from a number of raw pipes and pipe fittings (e.g. elbows, flanges, tees, etc.) in fabrication shops. Pipe spool fabrication is often affected by various ...

    Get Price
  • Piping Fabrication Procedure. [d47e32p03jn2]

    Activities shall be done according to the proper method statement for lifting and handling. 8.1.2 Pre-fabricated spools shall be shifted to site carefully; care shall be taken while handling and stacking of spools to prevent any possible damage. 8.1.3 The Pre-fabricated spools shall be identified by spool and line numbers before erection. 8.1.4 ...

    Get Price
  • Offshore Pipelines

    2016-8-13u2002·u2002use of spool concrete protection covers, which also act as anchors. The Mica Field is located in Mississippi Canyon Block 211 in the Gulf of Mexico, approximately 100 miles south of Mobile Bay, Alabama in water depth of 4,350 ft. Two 28 mile long production flowlines (an 8-inch x 12-inch pipe-in-pipe insulated flowline and an

    Get Price
  • Pipeline Introduction

    Transportation of liquids by pipelines has been used for thousands of years. The first major exploitation and commercialization using pipelines started 150 years ago, and the building of long distance, large diameter pipelines was pioneered in the 1940's (Hopkins, 2007).Today's pipeline industry has originated from the oil business that brought considerable amount of profit to the energy ...

    Get Price
  • Challenges and Lessons Learnt From the Design,

    2019-6-9u2002·u2002To stop pipe walking, measures have been taken, consisting in connection points installed in line during the laying of the pipelines (J-laying) and then anchoring structures, post-installed.

    Get Price
  • STRESS ANALYSIS OF UNDERWATER PIPELINE FOR

    2012-4-27u2002·u2002The focal point of this project is the simulation of pipe model using CAESAR II that focuses on the pipe stress analysis subjected to the pipeline. For economic reasons, the material that will be used for the fabrication of pipelines (for production and transmission of oil and gas) is carbon steels (API 5L X65). The area of seabed

    Get Price
  • Fundamentals of Process Plant Layout and Piping Design ...

    The nominal pipe size is 6'; PG is the service abbreviation and denotes 'Process Gas'. 117 is the line sequence number. GE – 2 is the piping material specification. Information on all the valves and valve specifications can also be seen on the P&ID.

    Get Price
  • Minimum pipe spool length - Pipelines, Piping and Fluid ...

    2006-3-1u2002·u200227 Feb 06 04:03. Can some one out there advice on minimum pipe spool lenth between fittings, I have been using 50mm for 2' pipes and 75mm for 6'. The service is oil production I could not lay my hand on any material to back my practice. Thanks.

    Get Price
  • Federal Register :: Oil and Gas and Sulphur Operations in ...

    2007-10-3u2002·u2002The proposed rule clarifies that accessories to ROW pipelines are subject to the requirements currently contained in 30 CFR 250, subpart H, Oil and Gas Production Safety Systems, and 30 CFR 250, subpart I, Platforms and Structures, just like all other OCS structures. It also clarifies that applications for new accessories are subject to Coastal ...

    Get Price
  • Flow Production of Pipe Spool Fabrication: Simulation to ...

    Pipe spool fabrication is an important stage in industrial construction project delivery. It is a complex production system characterized by product uniqueness and high product mix, which pose ...

    Get Price
  • SUBSEA PIPELINE SYSTEMS

    2021-7-31u2002·u2002The intention of this Guide is to serve as technical documentation for design, fabrication, installation and maintenance of offshore production, transfer and export pipelines made of metallic materials. The principal objectives are to specify the minimum requirements for classing, continuance of classing, certification and verification by ABS.

    Get Price
  • Piping Fabrication and Erection Specification

    PIPE SUPPORTS - Piping Fabrication and Erection Specification All field supports shall be installed in accordance with the standard drawings. If the field supports are not installed or are unavailable when the piping is erected, u s e temporary blocking or other adequate means of …

    Get Price
  • 27 September 2019 - Subsea 7

    2021-3-2u2002·u2002• The west Pipeline Bundle, at 7.619m long, is one of the longest executed from Wick Fabrication Site. • The east Pipeline Bundle at 147cm is the largest in diameter to date, and at 12.400t, the heaviest to date installed by Subsea 7. • Total length equaling 3.4km of pipe spools, 7.6km of tubing spools and 3.7km flying leads.

    Get Price
  • Onshore Pipeline - an overview

    Pipeline fabrication is not prone to weather interruptions. However, the constraints of using the tow/pull methods are • Limited fabrication length of pipe strings due to the size (length) of the fabrication yard and the difficulty of controlling a long line during towing out. The maximum line length to date using this method is about 7 km. •

    Get Price
  • TIDAL PORTS & MARINE CONSTRUCTION

    2019-11-9u2002·u2002TMC (LLC) was established with the indomitable purpose to provide a full range of diving services, including Riser Spool Installation, Pipe laying Projects, Salvage, Dredging & ROV Services, wharf and bridge pile encasement and more. The Company also provides Subsea Pipe Repairs, Inspection, NDT and other Subsea Services to a wide

    Get Price
  • Engineering pipeline innovation in the West - The ...

    2016-3-16u2002·u2002Engineering pipeline innovation in the West. 16 March 2016. The deepwater pipe lay vessel in operation on the Jansz-Io Subsea Pipeline. As part of the Chevron-operated Gorgon Project in Western Australia, the Jansz-Io subsea pipeline development tested the limits of design and construction. The pipeline, which accesses the remote offshore Jansz ...

    Get Price
  • (PDF) ???? Automated Post-Production Quality Control for ...

    Even one pipe-spool with small deficiencies and defects could cause multiple problems and challenges: rework costs, process or service audits, supplier surveillance, client complaints, etc.

    Get Price
  • PROCEDURE FOR MATERIAL HANDLING AND STORAGE

    2018-5-6u2002·u2002pipe spool, calculation (add 15% allowance for inaccuracies) or weighing. Guessing the weight of the load is not allowed. Crane user shall maintain record of how the weight was derived until the lift is successfully completed. Length x Width x Height (LxWxH): Is required for bigger equipment for deciding lifting radius and lifting height.

    Get Price
  • 2015: Engineering pipeline innovation in the West - The ...

    2021-3-30u2002·u20022015: Engineering pipeline innovation in the West. 30 March 2021. As part of the Chevron-operated Gorgon Project in Western Australia, the Jansz-Io subsea pipeline development tested the limits of design and construction. The pipeline, which accesses the Jansz-Io field, is an impressive 130 km-long and involved more than 80 contractors and ...

    Get Price
  • APTec – Allied Pipeline Technologies, Inc.

    APTec provides complete supply and installation of plastic pipe systems. In conjunctions with our HDPE pipe liner work we maintain a large fleet of thermal fusion-welding machines for HDPE, ranging from 2' (50mm) through 48' (1200mm). Our experience fusion-welding long distance pipelines means we can consistently and safely produce quality ...

    Get Price
  • Pipe Spool Fabrication Sequencing by Automated Planning

    Pipe spools are usually pre-fabricated from a number of raw pipes and pipe fittings (e.g. elbows, flanges, tees, etc.) in fabrication shops. Pipe spool fabrication is often affected by various ...

    Get Price
  • Piping Fabrication Procedure. [d47e32p03jn2]

    Activities shall be done according to the proper method statement for lifting and handling. 8.1.2 Pre-fabricated spools shall be shifted to site carefully; care shall be taken while handling and stacking of spools to prevent any possible damage. 8.1.3 The Pre-fabricated spools shall be identified by spool and line numbers before erection. 8.1.4 ...

    Get Price
  • Offshore Pipelines

    2016-8-13u2002·u2002use of spool concrete protection covers, which also act as anchors. The Mica Field is located in Mississippi Canyon Block 211 in the Gulf of Mexico, approximately 100 miles south of Mobile Bay, Alabama in water depth of 4,350 ft. Two 28 mile long production flowlines (an 8-inch x 12-inch pipe-in-pipe insulated flowline and an

    Get Price
  • Pipeline Introduction

    Transportation of liquids by pipelines has been used for thousands of years. The first major exploitation and commercialization using pipelines started 150 years ago, and the building of long distance, large diameter pipelines was pioneered in the 1940's (Hopkins, 2007).Today's pipeline industry has originated from the oil business that brought considerable amount of profit to the energy ...

    Get Price
  • Challenges and Lessons Learnt From the Design,

    2019-6-9u2002·u2002To stop pipe walking, measures have been taken, consisting in connection points installed in line during the laying of the pipelines (J-laying) and then anchoring structures, post-installed.

    Get Price
  • STRESS ANALYSIS OF UNDERWATER PIPELINE FOR

    2012-4-27u2002·u2002The focal point of this project is the simulation of pipe model using CAESAR II that focuses on the pipe stress analysis subjected to the pipeline. For economic reasons, the material that will be used for the fabrication of pipelines (for production and transmission of oil and gas) is carbon steels (API 5L X65). The area of seabed

    Get Price
  • Fundamentals of Process Plant Layout and Piping Design ...

    The nominal pipe size is 6'; PG is the service abbreviation and denotes 'Process Gas'. 117 is the line sequence number. GE – 2 is the piping material specification. Information on all the valves and valve specifications can also be seen on the P&ID.

    Get Price
  • Minimum pipe spool length - Pipelines, Piping and Fluid ...

    2006-3-1u2002·u200227 Feb 06 04:03. Can some one out there advice on minimum pipe spool lenth between fittings, I have been using 50mm for 2' pipes and 75mm for 6'. The service is oil production I could not lay my hand on any material to back my practice. Thanks.

    Get Price
  • Federal Register :: Oil and Gas and Sulphur Operations in ...

    2007-10-3u2002·u2002The proposed rule clarifies that accessories to ROW pipelines are subject to the requirements currently contained in 30 CFR 250, subpart H, Oil and Gas Production Safety Systems, and 30 CFR 250, subpart I, Platforms and Structures, just like all other OCS structures. It also clarifies that applications for new accessories are subject to Coastal ...

    Get Price
  • APTec – Allied Pipeline Technologies, Inc.

    APTec provides complete supply and installation of plastic pipe systems. In conjunctions with our HDPE pipe liner work we maintain a large fleet of thermal fusion-welding machines for HDPE, ranging from 2' (50mm) through 48' (1200mm). Our experience fusion-welding long distance pipelines means we can consistently and safely produce quality ...

    Get Price
  • Pipe Spool Fabrication Sequencing by Automated Planning

    Pipe spools are usually pre-fabricated from a number of raw pipes and pipe fittings (e.g. elbows, flanges, tees, etc.) in fabrication shops. Pipe spool fabrication is often affected by various ...

    Get Price
  • Piping Fabrication Procedure. [d47e32p03jn2]

    Activities shall be done according to the proper method statement for lifting and handling. 8.1.2 Pre-fabricated spools shall be shifted to site carefully; care shall be taken while handling and stacking of spools to prevent any possible damage. 8.1.3 The Pre-fabricated spools shall be identified by spool and line numbers before erection. 8.1.4 ...

    Get Price
  • Offshore Pipelines

    2016-8-13u2002·u2002use of spool concrete protection covers, which also act as anchors. The Mica Field is located in Mississippi Canyon Block 211 in the Gulf of Mexico, approximately 100 miles south of Mobile Bay, Alabama in water depth of 4,350 ft. Two 28 mile long production flowlines (an 8-inch x 12-inch pipe-in-pipe insulated flowline and an

    Get Price
  • Pipeline Introduction

    Transportation of liquids by pipelines has been used for thousands of years. The first major exploitation and commercialization using pipelines started 150 years ago, and the building of long distance, large diameter pipelines was pioneered in the 1940's (Hopkins, 2007).Today's pipeline industry has originated from the oil business that brought considerable amount of profit to the energy ...

    Get Price
  • Challenges and Lessons Learnt From the Design,

    2019-6-9u2002·u2002To stop pipe walking, measures have been taken, consisting in connection points installed in line during the laying of the pipelines (J-laying) and then anchoring structures, post-installed.

    Get Price
  • STRESS ANALYSIS OF UNDERWATER PIPELINE FOR

    2012-4-27u2002·u2002The focal point of this project is the simulation of pipe model using CAESAR II that focuses on the pipe stress analysis subjected to the pipeline. For economic reasons, the material that will be used for the fabrication of pipelines (for production and transmission of oil and gas) is carbon steels (API 5L X65). The area of seabed

    Get Price
  • Fundamentals of Process Plant Layout and Piping Design ...

    The nominal pipe size is 6'; PG is the service abbreviation and denotes 'Process Gas'. 117 is the line sequence number. GE – 2 is the piping material specification. Information on all the valves and valve specifications can also be seen on the P&ID.

    Get Price
  • Minimum pipe spool length - Pipelines, Piping and Fluid ...

    2006-3-1u2002·u200227 Feb 06 04:03. Can some one out there advice on minimum pipe spool lenth between fittings, I have been using 50mm for 2' pipes and 75mm for 6'. The service is oil production I could not lay my hand on any material to back my practice. Thanks.

    Get Price
  • Federal Register :: Oil and Gas and Sulphur Operations in ...

    2007-10-3u2002·u2002The proposed rule clarifies that accessories to ROW pipelines are subject to the requirements currently contained in 30 CFR 250, subpart H, Oil and Gas Production Safety Systems, and 30 CFR 250, subpart I, Platforms and Structures, just like all other OCS structures. It also clarifies that applications for new accessories are subject to Coastal ...

    Get Price